Excelsior emc substations12/17/2023 ![]() ![]() In his role as an in-house engineering consultant with Siemens in the UK, he was involved in developing the onshore and offshore substation designs associated with offshore wind farms. He then joined private industry working with contractors on power station and substation projects in the UK and overseas at voltages up to 500 kV and as diverse as the initial 400 kV supergrid for China Light and Power to project-managing the power supplies for the Channel Tunnel between England and France. John Finn worked initially in the electricity supply industry in the UK in protection, operation and maintenance, and system studies. He has presented more than 45 engineering and management papers and keynote addresses on aspects of substations, strategic asset management, diagnostics and monitoring, and the management of power networks to a number of international industry conferences and events. In addition, Terry is a graduate of the Australian Institute of Company Directors. He is an endorsed assessor for the asset management specification BSi PAS-55:2008 and, as a consultant, assists companies to develop asset management practices aligned to ISO 55000. An honors (first class) graduate of the University of South Australia (Bachelor of Engineering – Electrical), he is also a Fellow of the Institute of Engineers Australia (FIEAust) and a Registered Professional Engineer Queensland (RPEQ). He has held senior technical roles including major substation design, test and commissioning, condition monitoring, high voltage, and diagnostic testing of high voltage network plant. In a career that spans more than 40 years in the power sector, he has held senior management and technical positions at a number of Australian power utilities in generation, transmission, and distribution, where he led the introduction of new approaches to maintenance, substation design standardization, online condition monitoring, asset management, and risk management. ![]() He was appointed Chairman of the CIGRE Substation Study Committee B3 (Substations) in 2012. ![]() He studied electrical engineering at the University of South Australia following a Certificate of Electrical Engineering and an apprenticeship as an Electrical Instrument Maker. Terry Krieg was born in Gawler, South Australia, where he currently resides. Major objectives include increased reliability and availability, asset management, environmental impact containment, and the adoption of appropriate technological advances in equipment and systems to achieve these objectives. SC B3 serves a broad range of target groups in the Electric Power Industry whose needs include the technical, economic, environmental and social considerations of this scope in varying degrees. This guarantees that the book contains information that is based on the global exchange and dissemination of unbiased information for technical and non-technical audiences.Īlthough there are other works containing references to Substations, this book is designed to provide a complete overview of the topic in one book, providing a valuable reference for anyone interested in the topic.ĬIGRE Study Committee B3 is responsible for the design, construction, maintenance and ongoing management of substations and for electrical installation in power stations, excluding generators. The book was written by more than 30 experts from around the world and assembled through the Cigré study committee on Substations. The book includes topics, providing information for increased reliability and availability, asset management, environmental management aspects, and the adoption of appropriate technological advances in equipment and systems in substations. Additionally specialized substations such as ultra high voltage (UHV), offshore substations for wind power plants and the use of gas insulated lines are included. The content of the book covers a range of substation topologies: Air-Insulated, Gas-Insulated and Mixed Technology Switchgear Substations together with the essential secondary systems. This handbook offers the whole knowledge of high voltage substations from their design and construction to the maintenance and the ongoing management, the entire asset life-cycle. ![]()
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |